Sunday, September 28, 2008

October 2008

October 2008
1 - 10 Sketching
10 All make-up from tech lab Rotation 1 is due.
17 All missing sketches must be done
10- 24 Doing Drafting
24 End of Quarter

Monday, September 1, 2008

September 2008

September 2008
3 Quiz and MAP testing, work on Chapter 1
3-5 Work on Chapter 1
9 Begin Technology Lab for 10 Days, Rotation 1
25 Take Post test in Technology Lab, and turn in notes, lab sheet
26 Begin Sketching for about 10 days. students need: pencil, rulers, eraser and 1/4 inch Graph paper
26 S2 due
29 S3 due http://screencast.com/t/6Kzx0VpPdS
http://screencast.com/t/6Kzx0VpPdS

Sunday, June 29, 2008

August 2008

August 2008
21 - First Full Day
---- Please remember bring supplies add Pocket folder, High Litter, White Board marker to leave in class. First period student please bring Tissue and copy paper. All student will need a sprial with lined paper, pen and pencil each day.
22 - We will begin a two week unit on introduction to TECHNOLOGY

Tuesday, April 29, 2008

May 2008

May
5 .. Start back in teck Lab, 10 days to get lab rotation done.

Sunday, April 13, 2008

April 2008

April ....
1 Intro to wood
2 Hand Tools
8 Hand tool Quiz, make ups until 4/15, 8 am
9 Lab and tool safety
15 Chapter 1 quiz open book and notes due 4/16
17 Safety test ........... 90% or better to use power tools
21 Start Wood project About 2 weeks to get done
May 5 Project due, go to tech lab

29 Project is due on May 5; May 6 10% off, May 7 20% off , etc. if not done by May 16 a project grade of 0%. I will be in school by 7:15 each AM for the student to get their work done.

Tuesday, March 4, 2008

March 2008

Industrial Technology Class is working on:
March 2008:
3.... SK6 graded, step http://screencast.com/t/SgBHpgv2
4.... SK7 graded, top assembly http://screencast.com/t/SAPEBIy8X
SK8 graded, wedge http://screencast.com/t/2THLOTDGJ
5.... Add holes to SK7 as notes, explain center lines, re-demo hidden lines. Do SK9 http://screencast.com/t/AkaAZWcw
6 .... Sk10 http://screencast.com/t/nu20xWvbg
SK11
7 ....SK12 Extra credit and catch up day Front and top View of finish Pencil Holder, can only be turned in today in class. ALL SK -- DRAWINGS THAT WERE MISSED MUST BE TURNED IN BY SPRING BREAK OR ZERO GRADE STANDS
10 .... Begin Drafting until Spring Break do D-1 Border

11 .... D-2, Lines is assigned due on 3/12
12 .... D-3, is Sk 3... Base
13 .... D-4, is Top

14 .... D-5, is step
17 .... D-6, is wedge sk8
18 .... D 7, Top assbly sk-7, with holes
19 .... make-up day
20 ... lab clean up

D1 to D 7 must be done by the the end of quarter which ends April 4, They can not be done at home they must be done in the IT Lab

31 .... We start intro to woods, woodworking tools and safety. When unit is done the student must pass a safety test with a 90% or better to use power equipment to make the project.




Saturday, February 16, 2008

Feburary 2008

Feburary 2008
....18 - no school
....19 - Have Lesson 4 done
....20 - Have Lesson 5 done
....21 - Have Lesson 6 done
....22 - Watch video and take notes

....25 - Have Lesson 7 done, take post TEST, turn in all material related to the First Lab rotation(Lab Sheet, Notes and related work sheets)
....26 - Students need 1/4" graph paper, 12" ruler, eraser and pencils, SK1 -- Borders, Assign SK2 -- Lettering,due 2/27.
http://screencast.com/t/u5AVs0sb0
....27 - Do SK3 -- layout 3 view
....28 - Work SK4 and SK4B due today. Make a 3 view drawing of each
SK4 looks like this http://screencast.com/t/zAFs96uK5vy
SK4B loks like thishttp://screencast.com/t/KhfvRLQn
....29 - Explain Hidden Lines SK5 and SK6.